Banner
South Rowan High School
Rowan-Salisbury School System
Now Part of Education World
WelcomeEducatorsStudentsParentsMy SchoolNotes Personal Edition
User's Guide | View Notes | Edit Notes Teachers Register Here | Account Management | About Us | Help





Your Weather Newsletter Center



Content / User Guidelines



To request information by email, send inquiry to info@edgate.com
spacer

Mr. Wayne Freeman
SOUTH ROWAN HIGH SCHOOL
CHINA GROVE,   NC   28023
SchoolNotes last updated: Mon May 12 07:15:39 CDT 2008    Number of Visits: 726
Click here to send an e-mail to Mr. Wayne Freeman
Notify me when this page is updated. (Remove me)
SchoolNotes.com - Linking Educators to the Community
Clay Introduction
  1. Handouts and videos to give an overview of project
     ideas
  2. Demonstrate Techniques
     A. Slab
     B. Coil
     C. Pinch
  3. Requirements to demostrate
   A.Under glaze (make Cylinder, bisque, decorate and
     glaze, Glaze fire
     1. Stamp-Make a stamp w/your initials or symbol
        for your work
     2. Coil- Face jug completed with 8-10 in. height
        requirement
     3. Coil and/or slab- teapot with two mugs
        w/handles(projects needs to meet height
        requirement, decorated alike and a project
        theme)
     4. Slab- slab building meeting size requirements
        and surface requirements.  Student will
        demonstrate a vase with lid using soft slabs
        and a box using leather hard slabs. A surface
        change is required on the vase w/lid.
     5. Pinch- Whistle converted to a recongnizable
        object or figure using seven attachments.

To get full credit in clayworks, Student must complete the above seven project, meet height and surface requirements, and complete the required time with each project.

Glass Introduction
  1. Safety
    A. Eye protection
    B. Cutting and grinding protection
    C. Soldering protection
  2. Demonstration
    A. Straight cut project
       1. Student will draw and demonstrate  straight
          cuts in a mosaic project. (mid term due date)
    B. Curve cut Project
       1. Student will draw and demostrate a inside and
          outside cut in a project

STUDENTS WILL BE GRADED ON DAILY PARTICIPATION WITH EACH PROJECT ASSIGNMENT.

Student absences must be made up after school with their projects.
Some Favorite Links:
Attachments:

    
 November 2009
To view the full calendar, click the above link.
 Sun  Mon  Tue  Wed  Thur  Fri  Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


What's Happening Today
Saturday November 21, 2009
There are no events posted for today


Upcoming Events
There are no future events posted
Education Gateways makes no warranty for SchoolNotes.com.
Information on this site is generated by the users. The views
expressed are not necessarily those of Education Gateways or its members, and
Education Gateways is not responsible for user's conduct on SchoolNotes.com.

© 2006 by Education Gateways All rights reserved.
About us | Privacy Statement | Advertising | Linking Policies | Underwriter Policy